Skip to content
31.40°N 31.88°E — DAMIETTA

Every line under one roof

Production lines that move from raw material to packed, project-ready furniture — systematically.

WOOD LINE
01 —Solid Wood Production

Solid Wood Production

Milling, joinery, and shaping lines built for contract volume — from solid timber to engineered panels.

Materials
Kiln-dried beech, oak & panels
Tolerance
±0.5 mm on CNC-machined parts
Capacity
Contract batch runs
Lead time
Set per order
METAL LINE
02 —Metal Fabrication

Metal Fabrication

Cutting, bending, welding, and powder coating for frames, bases, and architectural metalwork.

Materials
Steel & aluminium — tube, sheet
Process
Cut, bend, weld
Finish
RAL-matched powder coat
Lead time
Set per order
UPHOLSTERY
03 —Upholstery

Upholstery

Frames, suspension, foams, and contract-grade textiles assembled to hospitality durability specs.

Materials
Contract textiles & foams
Standard
Hospitality durability specs
Capacity
Cut, sew & foam in-house
Lead time
Set per order
FINISHING
04 —Finishing & Assembly

Finishing & Assembly

Spray lines, surface control, and final assembly with inspection gates before packing.

Process
Spray, seal, surface control
QC
Inspection gates pre-packing
Packing
Export-ready cartons
Lead time
Scheduled per program
Go deeper
01From sheet to sofa The upholstery route, stage by stage, in photographs from the floor.02Every station on the record How work is logged at the shop-floor kiosk.03Capability sheet Two printable pages for procurement teams.

Have a spec to match.